Simply Reports should run missed scheduled jobs
If there is an issue with a scheduled Simply Reports job, it must be rerun manually. This includes problems with the SQL Job Polaris scheduling executive. For example, if one report takes longer than 30 minutes to run, the scheduling executive won't allow another instance of that SQL job to start, causing reports to be missed. Additionally, reports can be missed if the server is offline for a variety of reasons including during upgrades. Simply Reports should check the last run date for the report and reschedule it if the elapsed time is greater than the scheduled interval.